Puget Sound Energy (PSE)
Contact: Justin McConachie, 425-457-5777 
www.pse.com

Project: Ballinger Gas Line Replacement
Location: Ballinger Neighborhood
About:

Puget Sound Energy will replace existing steel and steel wrapped natural gas main with approximately 1490 lineal feet of 4” main. The new gas transmission main starts in the intersection of 15th Ave NE and Ballinger Way NE. The main then heads east on NE 205th St to 20th Pl NE. West of Gateway Place and at 19th Ave NE, approximately 120 lineal feet of main crosses county line into the City of Mountlake Terrace.
Schedule:   Gas work to be completed in late Fall, restoration to follow.
Impacts: Expect traffic delays. Typical hours of operation are 9:00am to 3:00pm.

----------------------------------------------------------------------------

Project: Westminster Gas Line Replacement
Location: Westminster Triangle and Highland Terrace Neighborhoods
About: Puget Sound Energy will replace existing wrought iron natural gas main with approximately 4300 lineal feet of 4” main. The new gas transmission main starts in the intersection of N 145th St and Westminster Way N. The main then heads northeast on Westminster Way N to N 148th St and proceeds eastbound on N 148th St to Fremont Ave N. It continues northward in Fremont Ave N to N 150th St. Gas line installation continues eastward in N 150th St to Linden Ave N. The line continues north in Linden Ave N and connects to an existing gas line in the south side of N 155th St.

* July 12, 2011 Neighborhood Preconstruction Meeting Agenda
* Information and Fact Sheet

Contacts: For Project Emergencies: 1-800-552-7171

For Project Non-Emergencies:
Justin McConachie (PSE): 425-457-5777
Adam Stauffer (Infrasource): 206-940-5748
Sue Kurnik (City of Shoreline): 206-801-2424
Paul Laine (City of Shoreline): 206-801-2461
Schedule:
Anticipated schedule is August 1 through Fall 2011.
Impacts:
Expect traffic delays. Typical hours of operation are 7:00am to 6pm on N 148th St, N 150th St, Fremont Ave N, and Linden Ave N. Hours of operation are 9:00am to 3:00pm on Westminster Way N, N 145th St, and N 155th St.

  

Ronald Wastewater District
Contact information: 206-546-2494

www.ronaldwastewater.org


Project:

Pipe Replacement Project NW
Location: Richmond Highlands Neighborhood / Carlyle Hall Road NW
Schedule: Work is anticipated to begin in Winter 2011.
Impacts: Expect traffic delays

--------------------------------------------------------------------------

Project: Pipe Replacement Project NE
Location: North City Neighborhood. Sewer line replacements (pipe bursting) in the NE area are:
  • 172nd Avenue NE
  • 171st Avenue NE
  • 170th Avenue NE
  •  Between 15th Avenue NE and 18th Ave NE
Schedule: Work is anticipated to begin in late Winter.
Impacts: Expect traffic delays.

Shoreline Water District
Contact information: 206-362-8100

www.shorelinewater.org 

Project: Water Main extension
Location: Ballinger and North City Neighborhoods. The main new transmission line starts at the intersection of NE 192ND St and 16th Ave NE. It then heads north to NE 195th St and connects into 15th Ave NE. From there the new main goes east, to NE 196th St to Forest Park Dr NE.
Schedule: Work is anticipated to be completed in late November 2011.
Impacts: Expect traffic delays.

---------------------------------------------------------------------------

Project: Boring under Ballinger Way NE
Location: Ballinger Neighborhood. There are two borings taking place on Ballinger Way NE. One is located by the King County Housing. The Metro stop will be relocated and still be available for riders. The second boring will take place on 20000 block of Ballinger Way NE
Schedule: Work is anticipated to be completed in late December 2011.
Impacts: None (not expecting any traffic delays).

CenturyLink Logo


Qwest / CenturyLink
Contact: Terry Huff, 206-345-5344 (office) or 206-794-8604 (cell)
Project: Aerial Cable Project
Location: Meridian Park Neighborhood
About: Qwest/CenturyLink will place 8400 lineal feet of aerial fiber optic cable and install five (5) new utility poles. The work will take place west of I-5 on N 167 St, north on Meridian Ave N, east on N 178 St, north on 1st Ave NE, east on NE 180 St, north on 3 Ave NE, east on NE 185 St to 5 Ave NE.
Schedule: Anticipated schedule is the week of June 13th to late Fall 2011.
Impacts: Expect traffic delays. Hours of operation are 9:00am to 3:00pm on arterial streets and 7:00am to 5:00pm on local streets.